Hi!
I will migrate from an existing windows nt domain to a windows 2003 domain.
the current windows nt domain:
1 windows nt server (main domain controller )
4 divisions with a 10 windows 2000 workstation
I think I can handel it so:
add a windows 2003 server to the existing domain and make it as a backup domain controller.
after this take the main windows nt server offline and upgrade the windows 2003 BDC to the primary domain controller.
But I have read this is impossible.
;(
can someone tell me the best workaraund for this huge migration to win 2003 ?
(the best for me is when not all devisions are upgraded / migrated at the same time to the win 2003 domain. at best when it happens step by step.
at first 1 devision and so on).
Kind Regards,
gicio
Bookmarks